The chapel is currently under construction and is expected to be completed by April 2008. The site location was selected to provide the utmost seclusion and reflection.
The 1600 square-foot facility was designed to handle more than a hundred people at one time, depending upon how it is configured (concert, classroom, or theater layout, and whether the optional outdoor patio seating is used).

The chapel will provide a large worship or meeting space, restrooms, storage, a small kitchenette, and a large outdoor patio area. A set of full-height folding doors allow the sanctuary space to be opened up to the outdoor patio area, which will allow summer weddings and other good-weather events to utilize a larger combined space.
Groundbreaking
